River Trent OLE Structure Replacement

The client

Akona Concepts were engaged by Story Contracting under an NEC3 contract to deliver the full Overhead Line Equipment (OLE) scope for the River Trent Viaduct project. This formed part of the wider North West & Central CP7 civil engineering and building works, where Story Contracting has been appointed by Network Rail.

Akona provided a full turnkey service, including OLE Contractors Responsible Engineer (CRE) for Construction, procurement of materials, supply of OLE 3–5 specialist labour, engineering assurance, and Network Rail handback. Our specialist team delivered comprehensive OLE design surveys, foundation assurance, material procurement, structure replacement, and OLE adjustments and bonding to support the associated track renewal works.

This project stands as another example of Akona’s commitment to safety, reliability, and delivery excellence—supporting the UK rail network in meeting its long-term infrastructure goals.

The task

 

 

 

 

 

The complete replacement of an OLE structure, followed by all the necessary adjustments and bonding, to support the track renewal associated with the River Trent Saddle and Waterproofing project.

The solution

 

 

 

 

 

Akona Concepts provided a full service, including design surveys, foundation assurance, materials, structure replacement, OLE adjustments and traction bonding.

The result

 

 

 

 

 

The project was completed safely, efficiently, and to the highest engineering standards: supporting the reliability and resilience of the UK rail network.

Summary

 

 

 

 

 

Through our collaboration with Story Contracting and Network Rail, Akona Concepts successfully delivered a critical OLE package, demonstrating our capability in managing rail infrastructure works.

Similar projects

Ardsley Bridge

+

Akona was contracted under NEC3 to deliver a comprehensive package of OLE and lineside civils work to facilitate the essential bridge repair works associated with the M62 overbridge crossing the East Coast Mainline.

Read more

River Trent Viaduct

+

Akona Concepts were engaged by Story Contracting under an NEC3 contract to deliver the full Overhead Line Equipment (OLE) scope for the River Trent Viaduct project. This formed part of the wider North West & Central CP7 civil engineering and building works, where Story Contracting has been appointed by Network Rail.

Read more

Great Western Electrification

+

Akona Concepts were tasked to support the engineering and design project teams with suitable junior and assistant engineers…

Read more

St Helens and Huyton to Roby

+

Akona Concepts were instrumental in the delivery of both projects, providing engineering assurance, project management and construction delivery…

Read more

Want to learn more about how we may help?

Contact us